The project team uses a micro surfacing machine to make the surface smooth before the final layer of asphalt is laid down. A pickup truck with specialized laser measuring equipment is used to verify the surface smoothness.

The project team uses a micro surfacing machine to make the surface smooth before the final layer of asphalt is laid down. A pickup truck with specialized laser measuring equipment is used to verify the surface smoothness.

Week of August 20, 2018

  • Mainline paving continues
  • Night time paving on I-80 westbound from Keystone Ave. to 4th At least one lane of traffic will be maintained at all times. Drivers can expect to see Friday evening paving operations.
  • Intermittent night time ramp closures on I-80 westbound between Keystone Ave. and East Verdi from 9 pm to 5 am. No two consecutive ramps will be closed at the same time.
  • I-80 eastbound and westbound overnight lane closures weekdays 7 pm to 7 am.